How the model calculates

  1. For each month of an average year, consumption is compared with the generation that cannot be controlled: run-of-river plants, nuclear, waste, wood and biogas, wind and solar.
  2. If power is missing, any seasonal battery delivers first, then the storage lakes.
  3. The lakes fill with their natural inflow. Once they are full, the water has to go through the turbines straight away.
  4. Whatever is still missing is imported.
  5. A surplus charges the battery. The rest is exported or curtailed. Solar power is curtailed first.
  6. The year is calculated again and again until the lakes and the battery are as full at the end of the year as at the start.

Costs are calculated as an annual payment: construction costs spread over the lifetime with interest, plus operation. The interest rate is real, that is, without inflation. All the code is open.

Electricity system

QuantityValueSource
Consumption today (national consumption)62.1 TWh, average of 2024 and 20251
Consumption 2050Electric cars +13 TWh, heat pumps +6.6 TWh, efficiency −13 TWh, total around 68.7 TWhElectrolysis and large heat pumps not included15
Run-of-river plants17.8 TWh in an average year, monthly profile 2016–202541
Natural inflow into the storage lakes19.4 TWh per year, 19 % of it in winterMonthly profile calculated from output, lake levels and pumping energy413
Storage lakes8.9 TWh, used between 6 and 92 %23
NuclearCapacity factor 88 %, monthly profile 2016–202521
Solar, roofs (Swiss Plateau)900 kWh per kW and year, 25 % in winter, profile of Swiss plants 2024/2517
Solar, facades644 kWh per kW, 39 % in winterMonthly profile is our own estimate11
Solar, alpine1’470 kWh per kW, 44 % in winterMonthly profile is our own estimate1113
Solar potential of buildingsRoofs 50 TWh, facades 17 TWh per year8

Costs

QuantitycheapmiddleexpensiveSource
Solar, roofs, construction costs800 CHF/kW1’200 CHF/kWAverage of the size classes: large roofs 660, single-family house 2’5001’900 CHF/kW910
Solar, facades, construction costs1’500 CHF/kW1’900 CHF/kW2’600 CHF/kW10
Solar, alpine, construction costs2’600 CHF/kW3’900 CHF/kW4’500 CHF/kW111012
Solar, operation and maintenanceRoofs 20, facades 25, alpine 70 CHF per kW and yearequivalent to 2 to 5 ct./kWh11
Solar, lifetime30 years11
Wind, costs12 ct./kWh15 ct./kWhweak source, industry figure18 ct./kWh34
Seasonal battery, construction costs150 CHF/kWh220 CHF/kWhfully built in Switzerland, including grid connection350 CHF/kWh2324
Seasonal battery, lifetime, losses20 years, 90 % efficiency, 1.5 % self-discharge per month25
New nuclear plant, construction costs6’000 CHF/kW9’000 CHF/kWwithout interest during construction; the model calculates this from the interest rate and construction time16’000 CHF/kW28293130
New nuclear plant, construction time8 years10 years15 years3230
New nuclear plant, operation, fuel, waste disposal39.3 CHF/MWh29
New nuclear plant, lifetime and capacity factor60 years, 88 %292
Existing nuclear plants, operating costs5 ct./kWh28
Interest rate for renewables and batteries (real)2 %3 %5 %14
Interest rate for new nuclear plants (real)3 %5 %7 %29
Imported power, price12 ct./kWh35
Surplus in summer, value0 ct./kWh; baseload power from nuclear and wind: 4 ct./kWh35

Image credits

Photos from Wikimedia Commons. The illustrations were created by an image generator from a text description. They do not show real plants.

Sources

Titles in the original language of the source.

  1. Bundesamt für Energie (BFE) (2000–2026): Schweizerische Elektrizitätsbilanz, Monatswerte (opendata ogd35)
  2. Bundesamt für Energie (BFE) (2026): Schweizerische Elektrizitätsstatistik 2025
  3. Bundesamt für Energie (BFE) (2000–2026): Füllungsgrad der Speicherseen, Wochenwerte (opendata ogd17)
  4. Bundesamt für Energie (BFE) (2026): Statistik der Wasserkraftanlagen der Schweiz, Stand 31.12.2025
  5. Bundesamt für Energie (BFE) (2014): Rentabilität der bestehenden Wasserkraft, Bericht zuhanden der UREK-N
  6. Bundesamt für Energie (BFE) (2014): Neues Fördermodell Wasserkraft, Bericht zuhanden der UREK-N
  7. BFE / Swissolar (2026): Statistik Sonnenenergie, Referenzjahr 2025
  8. Bundesamt für Energie (BFE) (2019): Schweizer Hausdächer und -fassaden könnten jährlich 67 TWh Solarstrom produzieren
  9. BFE / EnergieSchweiz (2026): Photovoltaikmarkt: Preisbeobachtungsstudie 2025
  10. Swissolar (2025): Solarmonitor Schweiz 2025
  11. Bundesamt für Energie (BFE) (2026): Technologiemonitoring Photovoltaik, V1.2
  12. Alpiq / Gondosolar (2023): Wirtschaftlichkeitsberechnung zum Baugesuch Gondosolar
  13. ZHAW (2023): Photovoltaik in den Alpen liefert im Winter bis zu viermal mehr Strom
  14. UVEK (2026): Kalkulatorische Kapitalkostensätze für Fördergesuche 2026
  15. BFE / Prognos, TEP, Infras (2020/2022): Energieperspektiven 2050+, Kurzbericht
  16. Fedlex (Stand 2026): Energiegesetz (EnG), SR 730.0, Art. 2
  17. Fedlex (2025): Stromversorgungsverordnung, Art. 19c (Garantierte Nutzung der Flexibilität)
  18. CKW, WWZ und weitere Netzbetreiber (2025): Gemeinsame Medienmitteilung: Regelung der Solarstromeinspeisung (70 %)
  19. UNSW Sydney (Poster, Sandia PV Reliability Workshop) (2024): Clipping and Curtailment Degradation
  20. ElCom (2025): Update Winterproduktionsfähigkeit
  21. ETH Zürich / PSI (2026): Weissbuch Kernenergie (DOI 10.3929/ethz-c-000801811)
  22. VSE / Empa (2025): Energiezukunft 2050, Update
  23. BloombergNEF (2025): Lithium-Ion Battery Pack Prices Fall to $108 per Kilowatt-Hour
  24. NREL (2025): Cost Projections for Utility-Scale Battery Storage: 2025 Update
  25. Tesla (2023): Megapack 2 XL Datasheet
  26. Energy-Storage.news (2024): CATL unveils BESS with 6.25 MWh per container
  27. Nant de Drance SA (2022): Das Kraftwerk
  28. Bundesrat (2025): Botschaft zur Volksinitiative «Blackout stoppen» und indirektem Gegenvorschlag (BBl 2025 2563)
  29. BAK Economics im Auftrag von economiesuisse (2026): Volkswirtschaftliche Auswirkungen eines KKW-Ersatzneubaus
  30. Cour des comptes (2025): La filière EPR : une dynamique nouvelle, des risques persistants
  31. Reuters via AJ Bell (2026): UK’s Hinkley Point nuclear plant costs raised to £35 billion
  32. SRF über Akademien der Wissenschaften Schweiz (2025): Ein allfälliges neues AKW wäre um 2050 in Betrieb
  33. Axpo (2023): Energy Report Windenergie
  34. Germany Trade & Invest (2024): Branche kompakt: Windenergie Schweiz
  35. Fraunhofer ISE, Energy-Charts (Daten: Bundesnetzagentur / SMARD.de, CC BY 4.0) (2023–2026): Day-Ahead-Preise Gebotszone Schweiz, stündlich
  36. ElCom (2026): Newsletter 07/2026: Wasserkraftreserve 2026/27
  37. Bundesrat (2025): Runder Tisch Wasserkraft: Stand der Projekte
  38. Bundesamt für Statistik (BFS) (2025): Bruttoinlandprodukt 2024 zu laufenden Preisen: 854 Mrd. Franken
  39. MeteoSchweiz (1991–2020): Heizgradtage (Normwerte), Grundlage für das Profil der Wärmepumpen